Snagging is your one structured chance to make the developer fix defects before you accept the keys — and it works much better before you've signed the handover paperwork than after. Here is when to do it, what a proper inspection covers, whether to hire a professional, and a room-by-room checklist you can take to the appointment.

  1. Handover noticeDeveloper invites you to inspect
  2. Book inspectionPro inspector or DIY, on site
  3. Snag reportEvery defect logged in writing
  4. Developer rectifiesFixes against the report
  5. De-snag re-checkVerify each fix, re-log misses
  6. KeysAccept the unit with a clean list
The snagging sequence — the leverage is highest before you accept the keys.

What snagging is

A snag is any defect in a newly built unit — a door that doesn't close flush, a hairline crack, a tap plumbed backwards, paint overspray on the glass. Snagging is the systematic inspection that finds them all and puts them in writing, so the developer's contractor rectifies them at the developer's cost, not yours. Brand-new buildings always have snags; a typical new unit produces a list running into the dozens. That is normal — what matters is that every item gets logged and fixed while the developer is still obliged to do it.

When it happens

Snagging belongs inside the handover notice window. When a project is certified complete, the developer sends buyers a completion notice inviting them to inspect the unit and settle the final installment. That inspection appointment is your snagging moment.

What a professional inspection covers

A proper snagging survey goes far beyond scuffed paint. Expect a professional to test:

Many firms also offer thermal-imaging or moisture-meter checks that find insulation gaps and damp a visual pass misses.

DIY or professional?

Choosing a snagging company

We deliberately don't recommend firms — here is how to judge any of them:

The room-by-room checklist

Work one room at a time, door to window, floor to ceiling. Log everything, however small — the report is the negotiation.

Every room

Kitchen

Bathrooms

Balcony & outside

Building & unit services

After the inspection

Send the report to the developer in writing, keep proof of delivery, and agree a rectification date. At the de-snag visit, check every numbered item — sign off only what is genuinely fixed, and re-log the rest. Anything still open when you take the keys should be listed in the handover documents as outstanding, not waved through. The paper trail is what turns a promise into an obligation.

Related: what's handing over each quarter · projects past their planned handover · Oqood and what happens to it at handover
General information, not legal advice — for a dispute, speak to a UAE-licensed property lawyer.